I have gained a good reputation for unusual and difficult contracting work both with our own equipment and running long reach excavators for our friends in the industry. This includes Wetland sites, Dredging work, Steep Slope work and Restricted access work.
I am extremely proud of the fact that if we are unable to solve a problem with our own fleet of equipment we have several other local contractors whom we can trust and work with to provide a bespoke solution to a project.

De Vegetation and Dredging of Highways England Attenuation Pond for J.W Baron 
De Vegetation and Dredging of Highways England Attenuation Pond for J.W Baron 
Shallow “Ha Ha” construction in restricted space with 1.5t machine and tilt hitch. 
Tidying of a Highways England Attenuation Pond Site prior to Demobilisation for
J.W Baron
Private wildlife pond construction 
Private wildlife pond construction 
Private wildlife pond construction 
1.5t Excavator and 1.5t Tracked Barrow Dewatering to enable a Dam Repair 
7.5t Excavator on Tidal tree works at Kingsbridge Estuary 
Dismantling of culvert at South Milton Sands for J.W Baron 
Demobilisation South Milton Sands 
Loading scrap steel outfall at South Milton Sands for J.W Baron 
Gate Repair/Post installation at Prawle for Devon Birds 
Pond at Bowden 
Ditching for Devon Birds 
Hauling Logs (piles) out at South Milton Lee 
Hauling Logs (piles) out at South Milton Lee 
Hauling Logs (piles) out at South Milton Lee 
The Takeuchi 1.5t being used to move logs at South Milton 
Hitachi 8.5t with Rototilt and
Case 130 Long reach